The Boat – 4th Floor

Main Contractor

Sommerville Fit Out

Project Description

Existing Air condition systems altered to suit new room layouts as well as 3 new single split cassette units installed in newly formed rooms with outdoor units being mounted on the outdoor gantry.  A new Cold water supply has been installed within the floor void from existing cold water supply within the landlords service riser,  The new Cold water supply feeds the new kitchen, Within the new kitchen there is an electric point for the water heater to feed hot water to the sink, and a zip boiling/ chilled water tap.

Facebook
X
LinkedIn