Porsche centre Belfast

Systems Installed

Contract value: £350,000

Hanna mechanical services supplied and installed gas fired LPHW boiler plant to provide Low Temperature Hot Water to serve radiators and a domestic how water cylinder together with all of the associated pumps, pressurisation unit, expansion vessel and controls. 

Workshop and Prep Areas heating is provided by Amibrad gas fired radiant tube heating. Car wash building has a gas fired warm air heater.

Offices and the car showroom have a Panasonic gas fired VRF system controlling heating and cooling requirements. The installation comprises VRF (variable refrigerant flow) multi split air conditioning system(s). Indoor units are individually controlled within cooling or heating mode from the same distribution box. (Not simultaneous heating or cooling). Temperature, fan speed, on/off can be controlled individually at each unit from the centralized controller.

Ventilation to all office areas are provided by Daikin air to air heat recovery units.

A Building Management System (BMS) is supplied, configured and commissioned by a controls specialist ATC Systems.

The BMS has a touchscreen to allow staff to view & make changes to time schedules, temperature set points, plant faults / alarms & logged data.